Over 30 years' experience · All trades in-house · Fully insured Call 07811 466054
Choosing a contractor

How to Choose a Bathroom Fitter (and What to Ask Them)

5 min read 7 sections

How to choose a bathroom fitter: what separates a good quote from a bad one, the questions to ask, and the warning signs worth walking away from.

In short: Choose a bathroom fitter on three things: whether the trades are in-house or subcontracted, whether the quote states what is excluded as well as what is included, and how close they are to you. Price differences between quotes are usually differences in scope, not in value.

What's in this guide 7 sections
  1. Why quotes for the same bathroom differ so much
  2. The questions worth asking
  3. Good signs
  4. Warning signs
  5. How much do reviews really tell you?
  6. Does it matter how local they are?
  7. Supplying your own materials

01 Why quotes for the same bathroom differ so much

Two quotes for the same room can differ by thousands, and the reason is almost never that one company is greedy. It is that they are quoting for different work.

Some quotes exclude tiling. Some exclude plastering, or making good, or waste removal, or the electrical work. Some price on a day rate and give an estimate rather than a fixed figure. When you compare quotes, compare the exclusions — that is where the difference lives.

02 The questions worth asking

  1. Which trades are yours, and which are subcontracted? This single answer predicts more about how your job will run than anything else.
  2. What is excluded from this quote? A good contractor has a ready answer and it is written down.
  3. Is this a fixed price or an estimate? And what would change it?
  4. What happens if you find something unexpected behind the old bathroom?
  5. How many working days, and which days will the toilet be out of use?
  6. Which parts of this are notifiable under building regulations, and who certifies them?
  7. What tanking system will you use in the shower area, and how far up the walls?
  8. Are you insured, and can I see the certificate?
  9. What is guaranteed, for how long, and what does the guarantee not cover?
  10. How far away are you, and how quickly can you come back if something needs looking at?

03 Good signs

  • They insist on visiting before quoting, and will not price from photographs.
  • The written quote is itemised and states exclusions explicitly.
  • They tell you when something you have asked for is a bad idea, and why.
  • They can explain what is behind the wall in a house of your type before opening it.
  • They raise building regulations without being prompted.
  • They give a realistic timescale rather than an optimistic one.
  • They are close enough to come back easily.
Vanity unit and toilet against navy herringbone tiling with a patterned floor
Our own work — choosing a contractor, North Derbyshire.

04 Warning signs

  • A price given over the phone or from photographs.
  • A quote that is a single figure with no breakdown and no exclusions.
  • Pressure to decide today, or a discount that expires.
  • A large deposit demanded up front — a deposit should cover materials, not fund the job.
  • Vagueness about who is actually doing the work.
  • No written terms, no insurance details, no address.
  • Cash-only, no paperwork. It also leaves you with no recourse at all.

None of these are proof of a bad contractor on their own. Two or three together usually are.

05 How much do reviews really tell you?

Review volume is a genuine signal, but read the content rather than the score. Reviews that name the town and describe the job — "bathroom refit in Warsop, turned up when they said, finished on time" — are worth far more than a wall of five-star ratings with no words.

Pay particular attention to how a company responds to a critical review. Prospective customers read the response more carefully than the review itself, and a defensive or blaming reply tells you exactly how a dispute on your job would go.

06 Does it matter how local they are?

More than most people expect, and it matters after the job rather than during it. Snags happen on the best-run projects: a valve that needs adjusting, silicone that needs redoing, a door that has dropped. A fitter based a few miles away can call in on the way past. One twenty-five miles away has to make a special trip, and will not do it quickly.

A local contractor also knows the housing stock. Someone who works in inter-war semis every week knows where the soil stack runs before opening the wall, which shows up as fewer surprises on your quote.

Walk-in shower with a recessed shelf, grab rail and white towel radiator
Our own work — choosing a contractor, North Derbyshire.

07 Supplying your own materials

Buying your own sanitaryware, tiles and taps often saves money, particularly in sales or clearance ranges. The risk is specification rather than price: items that look similar can have very different waste positions, tray depths or tap tails, and getting it wrong causes delays that cost more than the saving.

Ask your fitter to check the list before you order. Any decent contractor will do it free, because it saves them a wasted day too.

Reading up before you commit is exactly the right order to do this in. When you are ready, the quote is free.

Good to know

Frequently Asked Questions

Should I get three quotes for a bathroom?
Three is a sensible number — enough to see the range without dragging the process out for months. What matters more than the count is comparing like with like: ask each contractor for a written, itemised quote stating exclusions, then compare the scope before the price. A cheaper quote that excludes plastering and tiling is not cheaper.
How big a deposit is reasonable?
A deposit should cover materials ordered specifically for your project, not fund the labour. Anything approaching half the job value up front is worth questioning, and payment in full before work begins is never reasonable. Staged payments tied to milestones are normal on larger projects and should be set out in the written quotation.
What should a bathroom quote include?
A good quote itemises strip-out and waste removal, first and second fix plumbing, electrical work, plastering and making good, tanking, wall and floor tiling, fitting of the suite and brassware, silicone and final clean — and states clearly what is excluded, such as moving the toilet, structural work or the sanitaryware itself. If it is a single number with no detail, ask for the detail.
Is it worth using a company that does all trades in-house?
For a bathroom, yes, because six trades are involved in one small room. When they are subcontracted, calendar time stretches with each handover and accountability blurs if something later fails. With one team, the work runs continuously and one person answers for the whole result — which is what you actually want when a leak appears six months later.
Free, no-obligation quote

Want a Fixed Price for Your Own Project?

We visit, measure up, look at what's actually behind the walls, and give you a written quote with the exclusions stated plainly. Free, and no obligation.

Much of our work comes from repeat customers and recommendations, reflecting the standard we work to.

Call now WhatsApp Free quote